Original Tulua Marina portfolio visualization showing the stepped resort building frontage
Selected project / Hospitality & Leisure

The Island.

Tulua Marina · North Coast

From schematic design to tender.

Architecture. Structure. MEP. Landscape.
Developed in collaboration with Distance Studio.

Original portfolio visualization · With DSC / Distance StudioView full image ↗
01 / The project

Coastal living.
Connected by design.

Our six-tower assignment at Tulua Marina brings architecture, structural engineering, MEP and landscape together from schematic design through tender documentation, in collaboration with Distance Studio. DSC developed the concept design; QCC joined DSC at schematic design.

Location
Marina, North Coast, Egypt
Our scope
Architecture · Structure
MEP · Landscape
Design journey
Schematic design to tender
Collaboration
Distance Studio
The wider setting

The original aerial visualization places the development between the beach and marina. It provides context for our six-tower design assignment.

Original aerial visualization of the Tulua Marina development and its coastal setting
Tulua coastal setting · Original portfolio visualization · With DSC / Distance StudioFull size ↗
02 / Our role

Four disciplines.
One design journey.

Architecture, structural engineering, MEP and landscape developed through one connected process for our Tulua assignment.

01 / Design discipline

Architecture

Architectural design developed from schematic design through tender documentation, building on the DSC concept.

02 / Design discipline

Structural engineering

Structural design developed alongside the architecture and coordinated with building services.

03 / Design discipline

MEP engineering

Mechanical, electrical and public-health design integrated with the building.

04 / Design discipline

Landscape

Landscape design coordinated with the building approach and its outdoor setting.

03 / From schematic design to tender

Develop the idea.
Carry it through.

The architectural direction, structural design, building services and landscape move through a connected process toward the tender documentation.

  1. 01

    Schematic design

    Develop DSC’s concept with the project team and establish the requirements of the connected disciplines.

  2. 02

    Design development

    Develop the architecture, structure, building services and landscape together.

  3. 03

    Coordination

    Review the interfaces between disciplines as the design develops.

  4. 04

    Tender documentation

    Translate the coordinated design into the tender-stage information.

Your next project

Bring the disciplines
together from the start.

Discuss your project ↗